Arunachal Pradesh: Indigenous groups flag concerns over hydropower project study
The Cumulative Impact and Carrying Capacity Study, which was published in July 2016 and accepted by the Union environment ministry, is guiding the Centre to take a call on the 3,097 MW Etalin Hydropower Project and 16 smaller hydro projects planned in the region